Church of Jesus Christ and the Latter Day Saints

Kane Constructions
Stark Lane, Maroochydore
October 2014
September 2015
$382,000

CLIENT: 
LOCATION: 
START DATE: 
FINISH DATE: 
PROJECT VALUE: 

Description of Works

  • Site strip
  • Box out for pavement
  • Dense Vegetation Removal
  • Cut to Fill to design levels
  • Removal of unsuitable existing materials
  • Imported fill placed and compacted to level 1
  • Trimming for roadways, buildings and carparks
  • Kerb and Channel, Concrete invert swale
  • Stormwater Drainage including Pits and Manholes
  • Bio-retention Basin

Coolum Hotel

Rohrig Constructions
David Low Way, Coolum
April 2014
September 2015
$943,605

CLIENT: 
LOCATION: 
START DATE: 
FINISH DATE: 
PROJECT VALUE: 

Description of Works

  • Demolition of existing stormwater system
  • Demolition of existing roadway
  • Site strip
  • Box out for pavement and buildings
  • Vegetation and landscape removal
  • Cut to Fill to design levels
  • Removal of unsuitable existing materials
  • Imported fill placed and compacted to level 1
  • Trimming for roadways, buildings and carparks
  • Import of pavement design including asphalt flexible pavement.
  • Stormwater Drainage including Pits and Manholes
  • Concrete Footpaths, ramps, access points
  • Bio-retention Basin
  • External Roadworks to MRS
  • Liaise with Residents and Vendors

GP Super Clinic - Caboolture

Kane Construction
George Street, Caboolture
November 2014
July 2015
$894,000

CLIENT: 
LOCATION: 
START DATE: 
FINISH DATE: 
PROJECT VALUE: 

Description of Works 

  • Site strip
  • Box out for pavement and buildings
  • Cut to Fill to design levels
  • Removal of unsuitable existing materials
  • Imported fill placed and compacted to level 1
  • Trimming for roadways, buildings and carparks
  • Import of pavement design including asphalt flexible pavement.
  • Stormwater Drainage including Pits and Manholes
  • Bio-retention Basin
  • External Roadworks to MRS

Montessori International College

Hutchinson Builders
Stark Lane, Maroochydore
February 2014
April 2015
$771,069

CLIENT: 
LOCATION: 
START DATE: 
FINISH DATE: 
PROJECT VALUE: 

Description of Works

  • Site strip
  • Dense Vegetation Removal
  • Cut to Fill to design levels
  • Removal of unsuitable existing materials
  • Imported fill placed and compacted to level 1
  • Box out for pavement
  • Trimming for roadways, buildings and carparks
  • Import of pavement design including asphalt flexible pavement.
  • Stormwater Drainage including Pits and Manholes
  • Concrete Footpaths, ramps, access points
  • Bio-retention Basin

Chancellor College

Kane Constructions
Sippy Downs Drive, Sippy Downs
February 2014
April 2014
$139,000

CLIENT: 
LOCATION: 
START DATE: 
FINISH DATE: 
PROJECT VALUE:

Description of Works

  • Site strip
  • Box out for pavement and buildings
  • Dense Vegetation Removal
  • Cut to Fill to design levels
  • Removal of unsuitable existing materials
  • Imported fill placed and compacted to level 1
  • Stormwater Drainage including Pits and Manholes

Glen Eden Gardens

Altum Constructions
Glen Eden Drive, Gladstone
July 2012
March 2013
$1,162,000

CLIENT: 
LOCATION: 
START DATE: 
FINISH DATE: 
PROJECT VALUE:

Description of Works

  • Demolition of existing stormwater system
  • Demolition of existing roadway
  • Extensive Site strip
  • Box out for pavement and buildings
  • Vegetation Removal
  • Cut to Fill to design levels
  • Crushing and Screening of site won material
  • Removal of unsuitable existing materials
  • Imported fill placed and compacted to level 1
  • Trimming for roadways, buildings and carparks
  • Import of pavement design including asphalt flexible pavement.
  • Concrete Footpaths, ramps, access points
  • Bio-retention Basin
  • External Roadworks to MRS